Evidence register worksheet

The evidence register supports assessment of whether selected ORF requirements are implemented and continue to operate. Keep sensitive evidence in its approved system and link to a stable case, query, test, or artefact reference.

Outcome: an approver can determine requirement status without opening a nine-column spreadsheet or copying protected evidence into this page.

1. Status definitions

Status Use when
Not assessed Applicability and matrix obligation have not been reviewed
Planned Applicable and owned; implementation is not complete
Implemented Signal exists; acceptance or operating verification is incomplete
Verified Acceptance criteria passed and evidence is retained
Gap Required outcome is not met or evidence is unreliable
Waived A permitted, approved, and unexpired waiver exists
Not applicable The requirement's subject does not exist in the approved scope; the testable fact, reviewer, and reassessment trigger are recorded. This is a playbook status, not an ORF matrix action.

2. Requirement status overview

Keep this table short. Put implementation and test detail in the record below.

ORF ID and obligation Status Owner Latest evidence Next review
Example: ORF-AGT-04; Mandatory Verified Platform observability lead Propagation test EV-1042; coverage query Q-17 2026-11-01 or service-boundary change
Example: ORF-PERF-07; Good-to-Have Planned Model assurance lead Dataset approval dependency GOV-88 2027-Q1
Enter: ORF-___; matrix action Select: status above Enter: one accountable role Link: latest test/query/case reference Enter: date and trigger

3. Detailed requirement evidence

Create one record per selected ORF ID. This two-column structure replaces the unreadable nine-column table.

Example — ORF-AGT-04

Field Evidence record
Requirement and obligation ORF-AGT-04; Tier 2 trace; Mandatory for this High-Risk system
Applicability and use Multi-service material journey; used for incident reconstruction and trace-coverage monitoring
Implementation/schema W3C trace context; span contract trace-contract-v3; gateway, retrieval, model, guardrail, and tool producers
Dashboard/query Trace coverage dashboard D-04; missing-producer query Q-17
Acceptance evidence Normal, asynchronous-boundary, retry, timeout, and missing-context tests; result EV-1042, 2026-08-20
Evidence quality 99.97% coverage in test; schema-validity 100%; no restricted content in general trace
Owner and operation Platform observability lead; alert below 99.5%; runbook RB-TRACE-01
Issue/waiver None; Mandatory items cannot be waived
Next review 2026-11-01 and on gateway, service-boundary, or collector change

Copy for each selected ORF ID

Field What to enter
Requirement and obligation Enter: ORF ID, tier/type, matrix action, and register link
Applicability and use Describe: system fact and operational/assurance decision supported
Implementation/schema Link: event, span, metric, dashboard, control, or review contract and version
Dashboard/query Link: stable view or saved query; state expected interpretation
Acceptance evidence Link: test/exercise, date, environment, release, result, and reviewer
Evidence quality Record: coverage, validity, freshness, sample size, and known limitations
Owner and operation Enter: accountable owner, threshold/cadence, alert route, and runbook
Issue/waiver Link: defect, permitted waiver, compensating control, approver, and expiry—or None
Next review Enter: date and change/reassessment triggers

4. Waiver record

Do not use this section for Mandatory items. A waiver is valid only where the matrix permits it.

Field Record
Requirement and matrix obligation Enter: ORF ID and confirm “Mandatory but Waivable”
Underlying risk Describe: failure or harm the requirement addresses
Reason and duration Explain: why implementation is not currently feasible/proportionate and for how long
Residual impact and likelihood Record: approved assessment and assumptions
Compensating controls and evidence Link: controls, tests, monitoring, and operating evidence
Remediation Enter: deliverable, owner, due date, and success criteria
Approval Enter: authority, decision, effective date, and expiry date
Reassessment triggers List: changes or events that invalidate the waiver early

5. Verification history

Date and scope Test or exercise Result and evidence Defects/actions Reviewer
Example: 2026-08-20; release 2.4 Trace propagation and exporter-loss exercise Pass with action; EV-1042 Add queue-boundary test; OBS-231 Platform assurance
Enter: date, release, environment Describe: acceptance, incident, review, or exercise Select: Pass / Fail / Conditional; link result Link: action, owner, due date Enter: independent reviewer

Next: use verified evidence in the implementation-readiness checklist and periodic reviews.