Requirements register worksheet

Use this register to convert the complete ORF catalogue into explicit applicability, obligation, ownership, and delivery decisions. Do not start from a favourite tool or dashboard; start from the approved system profile and risk tier.

Outcome: all 61 ORF IDs have a recorded decision, and every selected item has an implementation use, owner, phase, and acceptance path.

1. Register metadata

Field Record
System and profile version Enter: stable system ID and approved profile version
Risk tier and approval Enter: Low / Medium / High, decision date, and approver
ORF source version Enter: framework release or commit used
Register owner Enter: accountable role and contact
Approval / next review Enter: decision date, review date, and reassessment triggers

2. Apply the matrix

The ORF priority tier describes how foundational an item is. The system risk tier determines the required action.

Priority tier High-Risk system Medium-Risk system Low-Risk system
Tier 1 Mandatory Mandatory Good-to-Have
Tier 2 Mandatory Mandatory but Waivable Good-to-Have
Tier 3 Mandatory but Waivable Good-to-Have Good-to-Have
Tier 4 Good-to-Have Good-to-Have Good-to-Have

See Risk and requirements matrix for the governing definitions.

3. Selection decision

Use one row for every ORF ID. “Not applicable” is a playbook record status, not an ORF matrix action. It requires a verifiable fact showing that the requirement's subject does not exist anywhere in the approved scope, plus a reviewer and reassessment trigger—not cost, effort, or lack of tooling.

ORF ID Tier/type and matrix action Applicability fact Decision and operational use Rationale
Example: ORF-AGT-04 Tier 2 trace; Mandatory Multi-service query–retrieval–model–tool journey exists Select; incident reconstruction and trace-coverage alerting End-to-end correlation is required to investigate failures
Example: ORF-PERF-07 Tier 4 metric; Good-to-Have Representative group-labelled test set is not yet approved Plan for later phase Fairness risk remains relevant; data and review protocol are prerequisites
Enter: ORF-___ Enter: tier, type, and matrix action Describe: relevant component, journey, or verifiable absence Select: Implement / Defer / Not applicable / Waiver requested; state use Explain: risk, evidence need, decision basis, reviewer, and reassessment trigger where relevant

4. Delivery record

Keep long schemas and metric definitions in the telemetry design; link them here.

ORF ID Planned implementation and evidence Delivery phase Owner and target Waiver or dependency
Example: ORF-AGT-04 OpenTelemetry trace context; coverage dashboard; propagation test Phase 1 foundation Platform observability lead; 2026-Q4 No waiver; depends on gateway propagation
Example: ORF-PERF-07 Governed offline evaluation by approved segments Phase 3 analytics Model assurance lead; after dataset approval Data-governance dependency; no waiver required
Enter: ORF-___ Link: design, query/dashboard, test, or evidence location Select: Phase 1 / 2 / 3 / Backlog Enter: one owner and date Enter: waiver ID, blocker, or None

5. Decision quality checks

  • All 61 ORF IDs were considered against the current system profile.
  • The approved risk tier was mapped to the matrix correctly.
  • Mandatory items have no waiver.
  • Every Not applicable record states a testable system condition, reviewer, and reassessment trigger.
  • Every permitted waiver includes risk rationale, compensating controls, approver, and expiry.
  • Good-to-Have items have an explicit implement/defer decision rather than being silently omitted.
  • Material system-specific risks not covered by ORF have additional telemetry requirements.
  • Every selected item has one operational use, owner, phase, and acceptance test.
  • Content handling, access, retention, and deletion are addressed before implementation.

Next: Design the telemetry. After implementation begins, track supporting evidence in the evidence register.